Techco-Electrics ETS s.r.o. – PV with storage for site self-sufficiency

Teplice: PV 311.3 kWp and BESS 302 kWh to increase energy self-sufficiency and ensure efficient operation of the manufacturing site.
KlientTechco-Electrics ETS s.r.o.
LokalitaÚstí nad Labem Region, Teplice
Výkon FVE311.3 kWp
Kapacita BESS302 kWh
Techco-Electrics ETS s.r.o. – PV with storage for site self-sufficiency

Techco-Electrics ETS s.r.o. is a Czech company active in electrical engineering and industrial automation. At its Teplice site, the company decided to install a modern photovoltaic system with storage to reduce operating costs, increase self-sufficiency and make effective use of renewable sources.

The project involved the installation of a 311.3 kWp PV plant and a 302 kWh battery system. The energy system is designed to cover a significant part of the site's consumption, ensuring efficient storage management and contributing to stable and economical operation.

YOUNG4ENERGY provided the feasibility study, design documentation (DSP, RPS, DSPS), complete engineering, author’s supervision (ADP) and technical supervision (TDI). Our cooperation also included grant advisory, UPOS/UTP grid connection with the DSO, BESS legalization and preparation of bids for balancing services (SVR). The project was successfully completed and commissioned.


Key parameters

ItemValue
ClientTechco-Electrics ETS s.r.o.
LocationTeplice, Ústí nad Labem Region
PV capacity311.3 kWp
Storage302 kWh (BESS)
Delivery2022–2024
Y4E roleFeasibility; design (DSP, RPS, DSPS); engineering; ADP; TDI; grants; UPOS/UTP; BESS legalization; SVR prep