Skip to content

Case studies & projects

A selection of projects for companies, cities and institutions. Every site has specific goals, constraints and benefits.
Found: 8Showing 18
  • RYKO a.s. – Two-phase energy system with PV and storage

    RYKO a.s. – Two-phase energy system with PV and storage

    RYKO a.s., Děčín: PV 1,095.64 kWp and BESS 322.5 kWh — a two-phase delivery to boost renewable generation and site self-sufficiency.

    Děčín
    2025
    Výkon FVE1 095,64 kWp
    Kapacita BESS322,5 kWh
  • SAPELI Group – Energy system with PV, BESS and METRICA

    SAPELI Group – Energy system with PV, BESS and METRICA

    Na Dolech site: rooftop PV 936.24 kWp, containerized BESS 2,137 kWh and METRICA control for monitoring, predictive control and peak shaving.

    Jihlava
    2025
    Výkon FVE936,24 kWp
    Kapacita BESS2 137 kWh
  • MALFINI a.s. – Energy system with PV and storage

    MALFINI a.s. – Energy system with PV and storage

    Comprehensive system at MALFINI logistics hub (2017–2025): rooftop & façade PV, BESS and METRICA for self-sufficiency and peak shaving.

    Ostrava
    2025
    Výkon FVE797,5 kWp
    Kapacita BESS593,8 kWh
  • SIKO KOUPELNY a.s. – Energy system with PV and storage

    SIKO KOUPELNY a.s. – Energy system with PV and storage

    Čimelice: PV 795.7 kWp and BESS 653.58 kWh for stable and efficient store operation. Project investor: LUCROS SICAV a.s.

    Čimelice
    2025
    Výkon FVE795,7 kWp
    Kapacita BESS653,58 kWh
  • SAPELI Group – Energy system with PV and storage

    SAPELI Group – Energy system with PV and storage

    Comprehensive energy system for SAPELI Group (Pavovská): rooftop PV 138.18 kWp, 300 kWh storage and METRICA-based control for efficiency.

    Jihlava
    2024
    Výkon FVE138,18 kWp
    Kapacita BESS300 kWh
  • HOPI a.s. – Energy system with PV, BESS and load control

    HOPI a.s. – Energy system with PV, BESS and load control

    Kralice na Hané site: PV 1,600 kWp, BESS 2,000 kWh and load control for peak shaving and higher self-consumption.

    Kralice na Hané
    2024
    Výkon FVE1 600 kWp
    Kapacita BESS2 000 kWh
  • Techco-Electrics ETS s.r.o. – PV with storage for site self-sufficiency

    Techco-Electrics ETS s.r.o. – PV with storage for site self-sufficiency

    Teplice: PV 311.3 kWp and BESS 302 kWh to increase energy self-sufficiency and ensure efficient operation of the manufacturing site.

    Teplice
    2024
    Výkon FVE311,3 kWp
    Kapacita BESS302 kWh
  • Farma Kamil Kublák – PV with storage for own consumption

    Farma Kamil Kublák – PV with storage for own consumption

    Fryčovice: PV 60.0 kWp and BESS 122.1 kWh for a family farm. Increasing self-sufficiency and optimizing costs through renewable generation.

    Fryčovice
    2024
    Výkon FVE60 kWp
    Kapacita BESS122,1 kWh

Why entrust your energy projects to Young4Energy?

We have delivered dozens of complex projects in industrial energy. We are not just component suppliers – we are a technology partner built on in-house development. The core of our solutions is the METRICA system, ensuring advanced control of PV and BESS.

We specialize in projects where reliability and ROI are key. Our battery storage systems are designed not only for savings (peak-shaving) but also for ancillary services and intraday market trading.

We take security seriously. All our implementations meet the strictest cybersecurity standards in compliance with NIS2.

Industrial PV and BESS installation with METRICA control

Frequently Asked Questions

Technical details and regulatory insights.

01

How do you control PV plants and battery storage?

We deliver all technology with our in-house developed METRICA system. This advanced EMS (Energy Management System) ensures predictive real-time control of production and consumption, maximizing savings and grid stability.
02

Can your BESS solutions generate revenue from ancillary services?

Yes. We integrate our industrial storage systems (e.g., JinKO SunGiga/SunTera) to enable not just peak-shaving, but also participation in ancillary services (FCR/aFRR) and intraday market trading. This significantly shortens the ROI.
03

Do your projects meet cybersecurity requirements (NIS2)?

Security is our priority. We design all projects in compliance with the strictest cybersecurity standards, including the NIS2 directive. We guarantee secure data transmission and protection for critical infrastructure.
04

Do you handle engineering and subsidies?

Yes, we provide turnkey services. From feasibility studies, project documentation, and subsidy administration to installation, grid connection, and long-term monitoring via METRICA.

Looking for a future-proof solution?

Let's look at your company's potential together. We will design a solution, calculate the ROI, and handle the implementation.